Laserfiche WebLink
• (Page 4) • <br />MINE ID # OR PROSPECTING ID # M-1994-113 <br />INSPECTION DATE 8-2-2000 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations IPVI (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />to be saecified <br />The corrective action for Problem No. 2, listed in the Division's 11-12-1999 by the MLRB <br />inspection report for the Pathfinder Pit was not complied with by the correction date PB or PV: PV <br />and has not yet been complied with. TOPICISI: RD <br />CORRECTIVE ACTION: <br />Attend the meeting of the Mined Land Reclamation Board scheduled to deal with this <br />possible violation and comply with the corrective actions ordered by the Board. The <br />operator has agreed to provide a technical revision to the permit to address this issue <br />by August 31, 2000. <br />2. Documentation of topsoil resources available for reclamation of the site has not been 9-15-2000 <br />submitted as committed to in the approved permit. PB or PV: PB <br />TOPICISI: AR <br />CORRECTIVE ACTION: _, _ _ <br />Submit the topsoil resource documentation within 30 days of the mail date of this <br />report. If this documentation indicates that the site does not have adequate resource <br />to replace the required topsoil amount, Pathfinder will have 60 days to post adequate <br />bond for importation of the required topsoil volume, or to stockpile the required <br />topsoil volume on site. <br />