Laserfiche WebLink
500 gallon hydraulic oil tank <br />500 gallon antifreeze tank <br />12,500 gallon diesel storage tank <br />12,500 gallon diesel storage tank <br />5,900 gallon gasoline tank <br />11,000 gallon elevated water storage tank <br />None underground. <br />3. List the number and volume of any PCB or PCB contaminated transformers. If no evidence of " <br />PCB Free" certifrcation is found, and operator cannot produce documentation during inspection, <br />list all transformers and volumes. <br />None. <br />~. Give the location, area, and rough volume of all equipment storage/bone yard areas on site. <br />Rough volume is obtained by estimating the height of material stored and approximate area <br />covered by the material. <br />Facilities area gravel hardstand area. Subtract out building and apron dimensions. 500' x 500'. <br />Stored materials consist of pipe, metal, items of equipment, etc., at approximately 20 cubic yards <br />total. There are three trucks, one drill, and two storage tanks (12,000 and 11,000 gallon) stored on <br />site. <br />5. List the location of any buried fuel tanks or fuel lines. If there are buried tanks, inquire about <br />the volume of them. <br />None <br />Distribution: Division Files, Operator, C:\bgw\WPDOCS\Keenesburg\midterm rvw 04 Coal Bond <br />Compliance Inspection Form.doc <br />Page 6 of 6, March 5, 2004 <br />