Laserfiche WebLink
SSR Cripple Creek & Victor Gold Mine VLF2 Phase 3 Stage B NewFields Job No. 475.0106.072 Week Ending Friday, May 2, 2025 <br />Page 3 <br />Spoke with KTI superintendent (Cody Jensen) about design parameters for Stage B sloping <br />towards the Stage A tie-in. At a minimum a 2 percent sloping must be obtained for positive <br />drainage. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br />Any damage that occurred to the geomembrane during Stage A tie-in exposure was protected <br />from inclement weather and marked for future repair. Exposed HVSC piping were trimmed <br />and capped preparing for future construction. <br />4.0 PHOTOGRAPHS <br />April 28, 2025 – Cut to grade along the Stage A tie-in