My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-18_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2026-02-18_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 4:01:04 PM
Creation date
2/20/2026 3:53:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/18/2026
Doc Name Note
Appendix E
Doc Name
6. Appendix E
From
CC&V
To
DRMS
Type & Sequence
TR156
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSR Cripple Creek & Victor Gold Mine VLF2 Phase 3 Stage B NewFields Job No. 475.0106.072 Week Ending Friday, May 2, 2025 <br />Page 3 <br />Spoke with KTI superintendent (Cody Jensen) about design parameters for Stage B sloping <br />towards the Stage A tie-in. At a minimum a 2 percent sloping must be obtained for positive <br />drainage. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br />Any damage that occurred to the geomembrane during Stage A tie-in exposure was protected <br />from inclement weather and marked for future repair. Exposed HVSC piping were trimmed <br />and capped preparing for future construction. <br />4.0 PHOTOGRAPHS <br />April 28, 2025 – Cut to grade along the Stage A tie-in
The URL can be used to link to this page
Your browser does not support the video tag.