Laserfiche WebLink
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: 2026-01-28 Update Site: AGRI-DLD Gravel Pit Permit Action: 2026-01-28 Update Permit/Job#: M2000030 <br /> <br />PROJECT IDENTIFICATION Task #: 000 State: Colorado Abbreviation: None <br />Date: 1/28/2026 County: La Plata Filename: M030-000 <br />User: DMC Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task Hours Cost <br />01a Reduce Highwalls to 2:1 DOZER 1 43.80 $22,126 <br />02a Push Overburden Downslope, Create 3:1 DOZER 1 35.36 $17,482 <br />03a Grade Pit Floor DOZER 1 43.03 $21,277 <br />04a Rip Compaction on Pit Floor RIPPER 1 54.68 $27,626 <br />05a Spread Topsoil on Slopes DOZER 1 2.75 $1,359 <br />06a Load and Carry Topsoil from Stockpile to Pit Floor TRUCK1 1 57.83 $14,613 <br />07a Spread Topsoil on Pit Floor DOZER 1 34.38 $17,000 <br />08a Revegetate REVEGE 1 40.00 $84,666 <br />09a Mobilize/Demobilize MOBILIZE 1 5.20 $3,687 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />317.03 <br /> <br />$209,836 <br /> <br />INDIRECT COSTS OVERHEAD AND PROFIT: Liability insurance: 2.02 Total = $4,239 <br />Performance bond: 1.05 Total = $2,203 <br />Job superintendent: 158.52 Total = $11,909 <br />Profit: 10.00 Total = $20,984 <br /> TOTAL O & P = $39,335 <br /> CONTRACT AMOUNT (direct + O & P) = $249,171 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: Financial warranty processing (legal/related costs): $500 Total = $500 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0 <br />Reclamation management and/or administration: 5.00 $12,459 <br /> <br />CONTINGENCY: 3.00 Total = $6,295 <br /> <br />TOTAL INDIRECT COST = $58,588 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $268,424 <br />