Laserfiche WebLink
Asphalt <br />Plant Elam Construction, Inc.Corp. Address: 7057 W 2100 S Salt Lake City, UT 84128Prepared by: Morgan WessnerTitle: Environmental Compliance & Admin TechnicianPrepared On: January 26, 2026Agri -DLD Gravel Pit #M-2000-030 Mining Phase Expansion Map <br />Area Of Phase <br />Boundary Adjustment <br />= 1.29 Acres <br />Drainage To <br />Be Filled In <br />With Culvert <br />Legend: <br />Property Boundary - <br />Existing Mining Phase Boundary - <br />Proposed Mining Expansion Area - <br />Proposed Future Mining Phase Area - <br />Proposed Drainage Culvert Area – <br />Proposed Crusher Location – <br />Direction of Proposed Mining - <br />