My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-21_REPORT - M1981043 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981043
>
2026-01-21_REPORT - M1981043 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 4:59:28 PM
Creation date
1/21/2026 4:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981043
IBM Index Class Name
Report
Doc Date
1/21/2026
Doc Name Note
CDPHE Stormwater Insp report
Doc Name
Annual Report Supplemental Information
From
CDOT
To
DRMS
Annual Report Year
2025
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Plan (SWMP) — Stormwater Only <br />Is there a SWMP and has it been updated for the facility for current conditions in accordance with Part I.L Stormwater Discharge Associated with Sand and <br />Gravel Productions.❑■ Yes ❑ No <br />(SWMP must be updated within 24 hours of any changes to the control measure, until final reclamation is completed for the site and the permit is terminated.) <br />List amendment(s) to the SWMP from this site inspection: <br />NONE <br />The latest copy of the SWMP and at least 3 years of monitoring data is retained by the permittee and is located at: <br />260 RANNEY ST CRAIG,CO 81625 <br />Identification of Discharges other than Stormwater <br />Evaluated the site for the presence of discharges other than stormwater, such as mine drainage spoils, springs, sanitary waste, or process water of any <br />kind. <br />Are there discharges other than stormwater on site (e.g., spill, leak, discharge of non-stormwater not authorized under COG500000)? 0 Yes ONO <br />If yes: <br />1. What was discharge? <br />2. Date of evaluation? <br />3. On -site drainage points that were directly observed during the evaluation? <br />Additional observations: <br />Is there equipment on site? ❑ Yes 0 No If yes, a visual inspection of equipment needed to implement the plan is required. <br />Are there any site piles containing salt? ❑ Yes 0 No if yes, the piles must be covered. <br />Is there any waste or garbage (floatable debris) on the site? ❑ Yes ❑■ No If yes remove immediately from the site. <br />Is there any construction or a change in design, operation, or maintenance at the facility significantly changing the nature of pollutants discharged in the <br />stormwater from the facility? ❑ Yes ❑■ No If yes provide explanation. <br />Other comments relating to the site: <br />3 <br />Inspector Signature: Title: Date: <br />1 certify that this report is true, accurate, and complete, to the best of my knowledge and belief. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.