My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-21_REPORT - M1981043 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981043
>
2026-01-21_REPORT - M1981043 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 4:59:28 PM
Creation date
1/21/2026 4:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981043
IBM Index Class Name
Report
Doc Date
1/21/2026
Doc Name Note
CDPHE Stormwater Insp report
Doc Name
Annual Report Supplemental Information
From
CDOT
To
DRMS
Annual Report Year
2025
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAND AND GRAVEL REPORTING <br />(Required for the CDPHE Annual Report) Revised: 4118118 <br />COLORADO <br />• De,,Paytment of T ranspioYtation <br />Facility Location: <br />Certification No.: <br />North of Douglas Pass Pit <br />COG502081 <br />Facility Location: <br />Weather Conditions <br />US 139 and Roe Canyon, Rio Blanco County <br />DRY <br />Monitor's Name; <br />Date of Inspection: <br />KIRK MARDESEN <br />10/07/2025 <br />Facility Inspection — Stormwater Only <br />DRMS Permit No.: <br />M-81-043 <br />SWMP Administrator Name: <br />KIRK MARDESEN <br />CDOT Work Order Number: <br />This inspection is being performed in compliance with Part I.J. of the Stormwater Discharge Associated with Sand and Gravel Productions. If an <br />inspection(s) was not conducted in accordance with the required frequency, attach an explanation of why. <br />1. Was this the required one time annually the monitoring was conducted during a runoff event? ('es IO No <br />2. Has the site created any process water (screen washing or transport slurry) or mine dewatering? O Yes E)No <br />OActive Site: Require 4 inspections annually (Quarterly). Date that facility became active: UN KNQWN <br />Inactive and Unstaffed Site wl No Exposure: Require 2 inspections annually (Spring/Fall) and a signed Certification of No Exposure (Page 4 of 5) <br />signed. Inactive requires that no activities have taken place atthe facility (except inspections) from the date of the last inspection listed here:L <br />DInactive and Unstaffed Site wt Exposure: Require 6 inspections annually (At least 20 days apart and no more than 2 months apart). Inactive requires <br />that no activities have taken place at the facility (except inspections) from the date of the last inspection listed here: <br />Control Measures at Time of Inspection <br />Control Measure <br />Maintenance <br />Additional Control <br />Comments — Include the location of <br />Date of <br />Used? (1) <br />Required? <br />Measures Needed? <br />control measure and description of <br />Correction <br />(2) <br />(3) <br />corrective actions required. <br />(4) <br />Y N <br />Y N <br />Y N <br />Clean Water Diversion <br />X <br />X <br />Sediment traplbasin <br />X <br />V <br />v <br />/�� <br />Perimeter control: Berm, Silt <br />X <br />X <br />fence, Erosion Logs, Bales <br />Check dam <br />X <br />X <br />Outlet protection <br />X <br />X <br />Vegetative Buffer <br />v <br />v <br />Landform <br />X <br />X <br />X <br />Seed/Mulch <br />X <br />X <br />Seed/Soil Retention Blanket <br />X <br />v <br />Other: (examples -vehicle tracking <br />X <br />X <br />ad, fencing, etc. <br />t l i in CateWileffler rr ie control measure listed is in use at this facility. <br />(2) Indicate whether the control measure requires any type of maintenance such as repair or removal of accumulated sediment; or if the control measure has failed. As <br />stated in the permit, repairs or maintenance identified shall be completed immediately. <br />(3) Indicate whether any new or different control measures are needed on the project_ As stated in the permit, revised control measures shall be implemented before <br />the next anticipated storm, but in no case more than 60 calendar days afterthe inspection. <br />(4) Enter the date that maintenance, repair, or replacement of control measure is completed, or that an new type of control measure is installed. <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.