Laserfiche WebLink
RECLAMATION COSTS <br /> Rule 6.4.12 of the Mineral Rules and Regulations requires that the Applicant provide a cost <br /> breakdown of reclamation costs sufficient to allow the calculation of the cost of reclamation <br /> that would be incurred by the State. <br /> The reclamation costs have been prepared assuming that the entire mining footprint in Area <br /> 1 has been excavated, thus minor regrading and placement of the 3-foot-thick clay liner <br /> bottom liner as closure. The reclamation costs incorporate the entire 50.7-acre excavation <br /> area and 2.9-acre area of Area 1 that is outside of the cell excavation area but will require <br /> revegetation, for a total acreage of 53.6 for Area 1 (as shown on Figure F-1 in Exhibit F). <br /> Reclamation of Area 2,which is used for soil staging and stockpiling only,will include removal <br /> of stockpiled clay soils or regrading of the stockpiled soils to match original drainage patterns <br /> in the 3.3-acre Area 2, and revegetating the area. The reclamation cost assumes that the <br /> entire 3.3-acre area will require regrading and revegetation,when in fact the actual area used <br /> for clay soil stockpiling may be less than the designated permit area. <br /> Weaver Consultants Group,LLC <br /> Q: WASTE CONNECTIONS SEDALIA�EXPANSION 2024l DRMS 112 PERMIT�EXHIBITL-RECLAMATION COSTS.DOCX Rev.0,10/2025 <br /> L-1 <br />