Laserfiche WebLink
85 onto Delva Way is asphaltic concrete. The roadway between the US Route 85 <br /> driveway to the entrance gate and scalehouse for the landfill is 2-lane asphalt- <br /> paved. <br /> Weaver Consultants Group,LLC <br /> Q:�WASTE CONNECTIONS)SEDALIA EXPANSION 2024�DRMS 112 PERMITS EXHIBIT D-MINING PLAN.DOC Rev.0,10/30/25 <br /> D-4 <br />