Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN(CONT) <br /> land will be reclaimed by the time mining is completed. Within <br /> one year after backfilling is complete, all resoiling and <br /> revegetation will be complete. The area will then be monitored <br /> for success of revegetation until it is released by the Board. <br /> The operator estimates that, this will happen 5 to 10 years after <br /> mining is completed. <br /> If revegetation problems occur on the grass areas before <br /> release, an analysis of the site will be made and the area will <br /> be revegetated again as necessary. The seed mixture and rates <br /> may be revised as needed to complete reclamation, if a modifica- <br /> tion is required, the Division will be notified prior to making <br /> the change. This gives us the most flexibility to complete <br /> reclamation successfully. <br /> RECLAMATION TIMETABLE <br /> ESTIMATED TOTAL GRAVEL <br /> PHASE YEARS AREA CROP GRASS SURFACES <br /> & ROAD <br /> Mined area 3-8 42.31 34.38 4.22 0.55 <br /> Shop area 1-3 13.16 1 0.0 1 0.0 3.16 <br /> TOTALS 8-15 1 45.46 1 38.71 1 4.22 1 3.71 <br /> 8 1/2 Enterprises LLC. December 9, 2025 <br /> Sasaki Pit 24 <br />