My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-12_PERMIT FILE - M2025063 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025063
>
2025-12-12_PERMIT FILE - M2025063 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 9:00:01 PM
Creation date
12/16/2025 7:45:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025063
IBM Index Class Name
Permit File
Doc Date
12/12/2025
Doc Name
Application
From
Environment, Inc
To
DRMS
Email Name
UEA
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN(cow) <br /> site. These ponds will be removed when the area is reclaimed. <br /> There will be no earthen dams on the mined area. <br /> The mining and reclamation plans consider existing wildlife <br /> conditions and final reclamation will not change the area for <br /> wildlife use. The mining and reclamation plans allow for the <br /> safety and protection of wildlife remaining on the mine site, at <br /> the processing site and along all access roads to the site. <br /> In general we have found there is little long term disturbance <br /> to native wildlife species around gravel mining operations . The <br /> big game species tend to use mining sites and newly vegetated <br /> areas after operations have stopped for the day. The smaller <br /> species tend to move to undisturbed areas . In practice this is <br /> done by limiting the amount of disturbance, restricting truck and <br /> equipment speeds to 15 mph or less and doing concurrent reclama- <br /> tion. Mine employees are trained to deal with wildlife found on <br /> the mine during operating hours to avoiding harming them. No <br /> threatened or endangered species have been observed on the site. <br /> Wildlife information is presented in EXHIBITH. <br /> Topsoil in the area (average 10-12 inches) is of good quality, <br /> so when it is removed to reach the mineral deposit, it will be <br /> segregated and stockpiled. If the topsoil and overburden piles <br /> remain undisturbed for more than a year, a vegetative cover using <br /> the proposed seed mix at the rate listed or other means will be <br /> employed to prevent erosion from wind and water and keep them <br /> free of contaminants so that they remain useful for sustaining <br /> vegetation when reclamation begins. The stockpiles will be <br /> located in areas where disturbances by ongoing mining operations <br /> will be at a minimum, i.e. , along setbacks on the pit perimeter <br /> or mine floor. The topsoil will be handled as little as possible <br /> until it is replaced onto disturbed areas . The operator will <br /> take measures necessary to insure the stability of the replaced <br /> topsoil on graded slopes and spreading it as evenly as possible. <br /> Fertilizer and other soil amendments may be used at the farm <br /> managers discretion during crop planting. <br /> RECLAMATION TIMETABLE <br /> Reclamation will begin once enough area has been opened so that <br /> any reclamation completed will not be disturbed as mining pro- <br /> gresses . Backfilling the side slope area will have priority over <br /> filling the mined floor and a large portion of the floor area <br /> will be backfilled and complete, but the area where mining has <br /> just ended may take 5 or more years depending on the economic <br /> conditions in the area and the amount of fill material available. <br /> The operator anticipates approximately 85% of the total mined <br /> 8 1/2 Enterprises LLC. December 9, 2025 <br /> Sasaki Pit 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.