Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN(CONT) <br /> tion since the practice for the agricultural activities are that <br /> crops are rotated from year to year. <br /> GENERAL DISCUSSION <br /> There are sufficient amounts of topsoil on the site so the <br /> mined areas can be resoiled to an average depth of 10-12 inches . <br /> Sufficient topsoil will be saved for use in reclamation. The <br /> available topsoil to be salvaged from the stripping process will <br /> preclude having to haul additional soils onto the site for <br /> revegetation. The existing soils on the property have been <br /> capable of producing healthy crops and grasses and are expected <br /> to work for use on mined areas that will be revegetated. The <br /> vegetation information was obtained from site visits and data <br /> provided in the vegetation information obtained from the MRCS <br /> soil survey web page. A copy Of that report is in EXHIBIT I and <br /> J and describes the current soils and vegetation on the proper- <br /> ties. <br /> As outlined in the EXHIBIT D-MININGPLAN, approximately 38 .7 acres <br /> ± of the permitted area will be disturbed as a result of mining <br /> activities . The plan calls for initially bonding to have 15. 00 <br /> acres ± disturbed at any-one-time. As mining progresses across <br /> the property some parts of the property will remain undisturbed <br /> while other areas will be either, stripped, mined, partially <br /> reclaimed or totally reclaimed. The MAP EXHIBIT C-1 -MINING PLAN MAP <br /> shows how the pit will look when approximately 75% is mined and <br /> partially reclaimed. The MAP EXHIBIT F-RECLAMATION PLAN MAP shows <br /> how the area will look when reclamation is complete. The area <br /> will be returned to at least its present vegetative condition or <br /> planted with a crop when reclamation is complete. <br /> Careful analysis of the growth medium and salvageable soil will <br /> permit the operator to carry out a soil additive program and to <br /> monitor the prescribed seeding plan to determine if the plan <br /> requires revision. Under normal weather conditions, an adequate <br /> moisture reserve will be present for establishment of the pro- <br /> posed seed mixture. Irrigation is planned for the crop areas on <br /> the backfilled area, but will not be used for the exterior <br /> slopes. No revegetation will take place on undisturbed areas, <br /> access roads or farm facilities . <br /> The reclamation timetables show the types and amount of land <br /> use in each use area when reclamation is complete. Approximately <br /> 14% of the area in the permit will not be disturbed by mining, <br /> either because it is farm facilities, or setbacks that are too <br /> small to mine and will be kept in their natural state. <br /> 8 1/2 Enterprises LLC. December 9, 2025 <br /> Sasaki Pit <br /> 16 <br />