Laserfiche WebLink
JD-8 Mine Stormwater Management Plan <br /> 41110 <br /> TABLE OF CONTENTS <br /> 1. DESCRIPTION OF MINING ACTIVITIES 1 <br /> 2. AREA SUBJECT TO EFFLUENT LIMITATIONS GUIDELINES 1 <br /> 3. SITE MAP I <br /> 4. STORMWATER MANAGEMENT CONTROLS 2 <br /> 4.1 SWMP Administrator 2 <br /> 4.2 Identification of Potential Pollutant Sources 2 <br /> 4.3 Stormwater Structural Controls and Best Management Practices(BMPs) 3 <br /> 4.3.1 Stormwater Diversion 3 <br /> 4.3.2 Materials Handling and Spill Prevention 3 <br /> 4.3.3 Sediment and Erosion Prevention 3 <br /> 4.3.4 Other Pollution Prevention Measures 4 <br /> 4.4 Preventive Maintenance 4 <br /> 4.5 Good Housekeeping 4 <br /> 4.6 Employee Education 5 <br /> 5. IDENTIFICATION OF DISCHARGES OTHER THAN STORMWATER 5 <br /> 41. 6. COMPREHENSIVE INSPECTION 5 <br /> 6.1.1 Inspections 5 <br /> 6.1.2 Maintenance 6 <br /> 6.1.3 Record-keeping 6 <br /> 7. REFERENCES 6 <br /> LIST OF TABLES <br /> Table 1. Routine Site Activities and Conditions Having the Potential to Affect Stormwater 3 <br /> LIST OF FIGURES <br /> Figure 1. Site Map Showing Potential Sources and Structural Controls to Reduce Potential Loading to <br /> Stormwater 7 <br /> LIST OF ATTACHMENTS <br /> Attachment A. Drainage Plan <br /> Attachment B. JD-8 Mine Stormwater General Inspection Checklist <br /> 4122A.I I060 I Cotter Corporation <br /> 1 <br />