Laserfiche WebLink
1,2 Legal Description <br /> The permit area is located in the following sections (6th Principal Meridian): <br /> • Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 14, 15, 16, 17, 18, 19, 20, 21, 22, 28, 29, and 30, Township <br /> 3 North, Range 93 West; <br /> • Sections 7, 13, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 26, 27, 28, 29, 30, 31, 32, 33, and 34, <br /> Township 4 North, Range 93 West; <br /> • Sections 1, 2, 3, 10, 11, 12, 13, 14, 15, 22, and 23, Township 3 North, Range 94 West; <br /> • Sections 12, 13, 23, 24, 25, 26, 27, 34, 35, and 36., Township 4 North, Range 94 West. <br /> A more precise legal description can be found on page 2.03-14 of the Permit Application <br /> Package (PAP). The legal description has changed as noted above and on page 2.03-14 of the <br /> PAP as a result of PR-05. <br /> 2. Proposed Decision <br /> The Division proposes to approve this application for revision (PR-05) of a valid, existing <br /> permit (C-1981-019) to conduct surface mining and reclamation activities in Colorado. <br /> Prior to PR-05, 23 stipulations were added to the Colowyo permit during previous approvals; As <br /> of the submission of PR5, all 23 prior stipulations have been complied with and/or terminated. <br /> With PR-05, no additional stipulations were added. <br /> Zero stipulations remain as part of the Colowyo Permit. <br /> This Decision is based on a finding that the operations will comply with all requirements of the <br /> Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et seq., and the Rules <br /> promulgated pursuant to the Act. Public notice of this proposed Decision will be published for <br /> two consecutive weeks in the Craig Daily Press. If no request for a formal hearing is made <br /> within thirty (30)days of the first publication of the public notice of this proposed Decision, then <br /> this Decision becomes final. The Division has calculated the amount of the reclamation bond to <br /> be posted as a result of PR-05. There is no change in the required financial warranty as a result <br /> of PR-05. The Application and all supporting documentation and any stipulations or conditions <br /> will become a binding part of the permit. <br /> 5 <br /> Permit Revision No.5(PR-05),G 1981-019 <br />