My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-03_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2025-11-03_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 8:38:59 PM
Creation date
11/3/2025 1:57:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
Revision
Doc Date
11/3/2025
Doc Name
Adequacy Review Response
From
Superior Oilfield Services Co., LTD
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L Reclamation Costs <br /> Volumes / Areas <br /> 38.77 acres to be reclaimed, plus access road from scales into mine area <br /> Unit Costs <br /> topsoil placement with scraper $1.45 per cu yd <br /> blade per hour $125.00 per hour <br /> equipment trips from Greeley $400.00 per round trip <br /> service/fuel truck $500.00 per day <br /> dozer per hour $100.00 per hour <br /> Direct Costs <br /> Final Grading <br /> 60 hrs blade time $7,500 <br /> 12000 cu yds of overburden placed $17,400 <br /> 32000 cu yds of topsoil placed $46,400 <br /> 3 equipment trips $1,200 <br /> 6 service/fuel truck days $3,000 <br /> 40 hrs dozer time $4,000.00 <br /> scale removal 5,000 <br /> Total Direct Costs $84,500 <br /> Indirect Costs <br /> Insurance/Bond/Superintendant/Profit @ 18% $15,210 <br /> Legal/ Engineering/Project Management @ 14% $11,830 <br /> Contingency $0 <br /> Total Indirect Costs $27,040 <br /> Total Reclamation Cost $111,540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.