My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-29_INSPECTION - C1982057
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2025-10-29_INSPECTION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 10:14:17 AM
Creation date
10/29/2025 3:20:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Date
10/29/2025
Doc Name
Inspection Report
From
DRMS
To
Seneca Property LLC
Inspection Date
10/21/2025
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 21, 2025 C-1982-057/Seneca II-W Mine NCG <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 2 of 6 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />NA - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br /> <br />Y - Roads <br />Y - Reclamation Success <br />Y - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On-site <br />Y - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />NA - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection conduced by Nikie Gagnon of the Colorado Division of Reclamation, Mining, and <br />Safety. Miranda Kawcek was informed of the inspection but was unable to attend. The weather was clear and <br />sunny. No hydrologic or air quality issues were detected at the time of inspection. <br />PERMITTING ACTIONS in PROGRESS: <br />On October 7, 2025, the Division issued a proposed decistion to approve the Phase III Bond Release of the final <br />107.6 acres (SL-8) remaining in the permit. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />Reclamation is complete at this site. The SL8 areas have established vegetation meeting the minimum ten-year <br />liability period and can support the approved post-mining land uses. <br />During this partial inspection, the Division viewed the following items: <br />SIGNS and MARKERS – Rule 4.02 <br /> The mine identification sign was in place at the site entrance from the County Road and meets the <br />requirements of the Rule (Photo 1). Two additional signs were observed at alternative entrances along <br />CR53 (Photo 2). <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3) I 4.03.2(3); Drainage 4.03.1(4) I 4.03.2(4); Surfacing and Maintenance 4.03.1(5) and (6) I <br />4.03.2(5) and (6); Reclamation 4.03.1(7) I 4.03.2(7) <br /> The dirt road from the mine entrance off CR 53 to Pond 6 was dry and maintained. The roadside ditch is <br />functioning as designed to control erosion and sedimentation. Vegetation is well established adjacent to <br />the road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.