Laserfiche WebLink
<br /> <br />London Mountain Clean Up <br />July 2025 D-6 <br /> <br /> <br />8. Proposed Roads <br />As mentioned in Exhibit C of the London Mine 110D permit in Appendix 1, waste piles will continue to <br />be accessed via either existing roads or roads to be installed during operations. All new roads will be <br />located within the affected area. Roads will remain in reclamation as needed to facilitate access to <br />different areas of the site. Road installations will be on a case-by-case basis depending on the piles <br />being excavated in a given year. All roads will be built to Park County road standards as applicable. <br />9. Ponds and Water Infrastructure <br />Any and all water infrastructure designs can be seen on Maps C-2 and C-2A. Hydrology discussion is <br />covered in Exhibit G.