Laserfiche WebLink
<br />901 E. Orangethorpe Ave. Anaheim, CA 92801 <br /> Office (714) 921-9848 Fax (866) 475-1225 <br />www.ecapplications.com <br /> <br /> <br /> <br /> <br />JOSE QUIROZ <br />PROJECT SUPERINTENDENT <br /> <br /> <br />Jose has been active in the geosynthetics installation industry since 2022. He has 2 year of <br />experience as a Project Superintendent. He is responsible for day-to-day site management, quality, <br />safety, production and personnel training. He has assisted in all aspects of lining system installation <br />and has had in-house training and hands on experience satisfying all the criteria required to be rated <br />as a Superintendent, Master Welder, QC Technician and Equipment Operator. Jose has successfully <br />supervised 10 million square feet of geosynthetics throughout his outstanding career. <br /> <br /> <br /> <br /> <br /> Components Installed Applications <br /> <br /> HDPE (Textured & Smooth)  Landfill Cells (including Haz) <br /> LLDPE (Textured & Smooth)  Landfill Closures <br /> Hypalon  Leachate Ponds <br /> XR 5 <br /> Polypropylene <br /> Waste Water Lagoons <br /> Potable Water Reservoirs <br /> Geotextiles  Evaporation Ponds <br /> Geocomposites  Leach Pads <br /> PVC  Process Ponds <br /> GCL  Tank Liners <br /> Geo-Net  Tailings Impoundments <br /> HDPE Sumps  Floating Covers <br /> Pipe Boots  Secondary Containment <br /> Batten Systems  Methane Barriers <br /> <br /> <br /> <br /> <br />The Superintendent is the direct contact between the Project Manager and the craftsmen performing <br />installation tasks. His job is to implement the plans, budget and monitor the progress on a daily <br />basis as well as assist with updates on critical path schedules. The Superintendent and Project <br />Manager work together as a team to ensure that each project is delivered on-time, within budget and <br />at the highest quality. <br /> <br />