My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-20_REVISION - M1980244 (18)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-10-20_REVISION - M1980244 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:22:24 PM
Creation date
10/21/2025 10:13:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/20/2025
Doc Name Note
6. APPENDIX H
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR153
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />901 E. Orangethorpe Avenue Anaheim, California 92801 <br /> Office (714) 921-9848 Fax (866) 475-1225 <br />www.ecapplications.com <br /> <br /> <br /> <br />GILBERTO BELLO <br /> <br />GENERAL SUPERINTENDENT <br /> <br />Gilberto has been active in the geosynthetics installation industry since 1990. He <br />has 20(+) years of experience as a Project Superintendent and over 1,000,000 <br />SF of installation experience. He is responsible for day-to-day site management, <br />quality, safety, production, and personnel training. He has assisted in all aspects <br />of the installation of the lining system. He has had in-house training and hands- <br />on experience satisfying all the criteria required to be rated as a Superintendent, <br />Master Welder, and QC Technician. Superintendent rating requires a minimum <br />of ten million square feet of installation experience. <br /> <br />Gilberto has completed numerous complex liner installation projects across the <br />United States and internationally. <br /> <br /> <br /> Components Installed Applications <br /> <br /> HDPE (Textured & Smooth) Landfill Cells <br /> LLDPE (Textured & Smooth) Landfill Closures <br /> Hypalon Leachate Ponds <br /> XR 5 / PTF <br /> Polypropylene <br /> Waste Water Lagoons <br /> Potable Water Reservoirs <br /> PVC Evaporation Ponds <br /> GCL Leach Pads <br /> HDPE Sumps Process Ponds <br /> Pipe Boots Tank Liners <br /> Batten Systems <br /> <br /> Tailings Impoundments <br /> <br /> <br /> <br />The Superintendent is the direct contact between the Project Manager and the <br />craftsmen performing installation tasks. His job is to implement the plans, budget <br />and monitor the progress daily as well as assist with updates on critical path <br />schedules. The Superintendent and Project Manager work together as a team to <br />ensure that each project is delivered on time, within budget, and at the highest <br />quality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.