My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-20_REVISION - M1980244 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-10-20_REVISION - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:22:24 PM
Creation date
10/21/2025 10:09:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/20/2025
Doc Name Note
6. APPENDIX E
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR153
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSR Cripple Creek & Victor Gold Mine VLF2 Phase 3 Stage B NewFields Job No. 475.0106.072 Week Ending Friday, April 25, 2025 <br />Page 2 <br />1.0 CONTRACTOR OPERATIONS <br /> Earthworks <br />1.1.1 Subgrade <br />Kelley Trucking (KTI) used a John Deere 950k and D8 LGP dozer to prepare subgrade of Stage B <br />between elevations 10,200’ and 10,450’. <br />1.1.2 Structural Fill <br />No structural fill was placed during this period. <br />1.1.3 Soil Liner Fill <br />No soil liner fill was placed during this period. <br />Geosynthetics <br />JHL Constructors (JHL) continued to expose geomembrane along the Stage A tie-in. A Volvo <br />ECR88D excavator with a straight bar welded across the bucket teeth removed the approximately <br />2’ thick layer of DCF. A minimum 3’ strip of geomembrane was exposed. 1-2 JHL laborers assisted <br />by spotting for the excavator and removing the final thin layer of DCF from the geomembrane. <br />All material removed from the tie-in was placed within the existing Stage A limits. <br />KTI removed overburden material from the abandoned Stage A parallel CC&V operations haul <br />road. A 349 excavator removed the material from above the northern Stage A tie-in to create a <br />safe working area for JHL to continue to expose geomembrane. All material removed from the <br />tie-in was placed within the existing Stage A limits. <br />No geosynthetics were installed during this period. <br />2.0 MEETINGS AND COMMUNICATIONS <br />NewFields personnel conducted daily safety meetings at 7:00am. <br />NewFields personnel attending the weekly owners meeting with JHL, KTI and CC&V. Topics <br />of discussion included safety, construction schedule, and weather. <br />Spoke with JHL superintendent (James Land) about the damaged 24” HVSC pipe on the <br />northern end of Stage B. Requested the pipe be exposed to a non-damaged section and <br />capped until it could be tied in with the future Stage B piping.
The URL can be used to link to this page
Your browser does not support the video tag.