Laserfiche WebLink
Table 2Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B.1 Record of ConstructionEarthworks Testing Summary and FrequencyStructural Fill (SF)Soil Liner Fill (SLF)Drain Cover Fill (DCFO)Quantity of Material Placed (cy) 2,450 43,944 87,890Particle Size Tests Performed 1 14 11Specified Particle Size Test Frequency 50,000 4,000 20,000Actual Particle Size Test Frequency 2,450 3,139 7,990Atterberg Limit Tests Performed 1 14 11Specified Atterberg Limit Test Frequency 50,000 4,000 20,000Actual Atterberg Limit Test Frequency 2,450 368 7,990Laboratory Compaction Tests Performed See Note 1 14 N/ASpecified Compaction Test Frequency N/A 4,000Actual Compaction Test Frequency N/A 3,139Permeability Tests Performed N/A 14 N/ASpecified Permeability Test Frequency 4,000Actual Permeability Test Frequency 3,139Moisture Content Tests Performed See Note 1 102 N/ASpecified Moisture Content Test Frequency 2,000 500Actual Moisture Content Test Frequency See Note 1 431Field Nuclear Density Tests Performed See Note 1 102 N/ASpecified Nuclear Density Test Frequency 2,000 500Actual Nuclear Density Test Frequency See Note 1 431Field Depth Verification Tests Performed N/A 102 N/ASpecified Depth Verification Test Frequency 2.0 test/acActual Depth Verification Test Frequency 4Notes:2. All frequencies are based on quantities in cubic yards unless stated otherwise.3. N/A = Not ApplicableMaterial QuantityNumber of TestsTest FrequencyN/AN/A1. The method of compaction technique was used in accordance with the project technical specifications due to the large particle size.N/AN/AN/AN/AN/APage 1 of 1