Laserfiche WebLink
Table 1 <br />Cripple Creek & Victor Gold Mining Company <br />Valley Leach Facility 2 Phase 3 <br />Stage B.1 Record of Construction <br />Summary of Earthworks Material Specifications <br />Sieve Size Percent Passing <br />24 inch 100 <br />8-inch 40-100 <br />No. 200 0-25 <br />2 inch 100 <br />No. 200 15-65 <br />3 inch 100 <br />2 inch 97-100 <br />3/4 inch 40-100 <br />No. 4 5-35 <br />No. 200 0-8 <br />Note: <br />1. NP - Non Plastic <br />2. N/A - Not Applicable <br />Soil Liner Fill <br />(SLF) <br />10 <br />Minimum 1 x 10-6 <br />N/A2 <br />Drain Cover Fill- Crushed <br />Ore (DCFO)NP N/A <br />Grain Size Distribution <br />Material Plasticity <br />Index <br />Permeability <br />(cm/s) <br />30 <br />Maximum <br />Structural Fill <br />(SF) <br />Page 1 of 1