Laserfiche WebLink
STAGE B LEAK DETECTION TRENCH 1 ALIGNMENT TABLE <br />STATION <br />NORTHING <br />EASTING <br />DELTA (D-M-S) <br />LENGTH (FT) <br />RADIUS (FT) <br />EP <br />0+00.00 <br />59,081.69 <br />37,650.29 <br />PC <br />0+07.12 <br />59,074.96 <br />37,652.61 <br />016-36-16 <br />14.05 <br />48.48 <br />EP <br />0+21.17 <br />59,061.20 <br />37,655.21 <br />PC <br />1+11.17 <br />58,971.28 <br />37,658.96 <br />006-45-40 <br />4.97 <br />42.10 <br />EP <br />1+16.13 <br />58,966.31 <br />37,658.88 <br />PC <br />2+40.07 <br />58,842.74 <br />37,649.44 <br />006-31-57 <br />1.14 <br />10.00 <br />EP <br />2+41.21 <br />58,841.61 <br />37,649.29 <br />PC <br />2+71.21 <br />58,812.15 <br />37,643.61 <br />016-20-35 <br />2.98 <br />10.45 <br />EP <br />2+74.19 <br />58,809.19 <br />37,643.47 <br />PC <br />3+09.61 <br />58,773.92 <br />37,646.83 <br />01 1-41-42 <br />164.58 <br />806.33 <br />EP <br />4+74.20 <br />58,609.62 <br />37,645.67 <br />PC <br />5+32.69 <br />58,551.48 <br />37,639.29 <br />045-15-58 <br />264.84 <br />335.22 <br />EP <br />7+97.53 <br />58,303.95 <br />37,712.05 <br />PC <br />8+01.47 <br />58,300.88 <br />37,714.53 <br />030-53-31 <br />9.88 <br />18.32 <br />EP <br />8+11.35 <br />58,291.94 <br />37,718.44 <br />PC <br />10+42.74 <br />58,062.87 <br />37,751.12 <br />003-07-12 <br />8.62 <br />158.25 <br />EP <br />10+51.35 <br />58,054.31 <br />37,752.10 <br />PC <br />11+55.56 <br />57,950.50 <br />37,761.19 <br />004-08-32 <br />5.80 <br />80.19 <br />EP <br />11+61.36 <br />57,944.72 <br />37,761.48 <br />PC <br />13+39.77 <br />57,766.32 <br />37,764.16 <br />009-13-56 <br />1.61 <br />10.00 <br />EP <br />13+41.39 <br />57,764.72 <br />37,764.31 <br />PC <br />13+65.49 <br />57,740.98 <br />37,768.53 <br />114-09-56 <br />19.93 <br />10.00 <br />EP <br />13+85.42 <br />57,734.47 <br />37,784.01 <br />PC <br />13+97.03 <br />57,741.00 <br />37,793.60 <br />002-12-34 <br />39.15 <br />1015.18 <br />EP <br />14+36.18 <br />57,762.41 <br />37,826.38 <br />PC <br />14+45.47 <br />57,767.34 <br />37,834.25 <br />003-26-37 <br />55.71 <br />926.99 <br />PC <br />15+01.18 <br />57,795.47 <br />37,882.34 <br />087-51-02 <br />15.33 <br />10.00 <br />PC <br />15+16.51 <br />57,791.80 <br />37,895.72 <br />004-02-35 <br />33.84 <br />479.63 <br />EP <br />15+50.36 <br />57,763.35 <br />37,914.03 <br />PC <br />16+04.71 <br />57,718.72 <br />37,945.05 <br />004-39-42 <br />44.73 <br />549.79 <br />EP <br />16+49.44 <br />57,683.06 <br />37,972.04 <br />PC <br />17+05.36 <br />57,639.89 <br />38,007.57 <br />004-49-23 <br />44.89 <br />533.23 <br />EP <br />17+50.24 <br />57,606.47 <br />38,037.52 <br />PC <br />18+07.58 <br />57,565.42 <br />38,077.56 <br />004-55-52 <br />45.48 <br />528.42 <br />EP <br />18+53.06 <br />57,534.27 <br />38,110.67 <br />PC <br />19+11.82 <br />57,495.88 <br />38,155.15 <br />004-51-13 <br />37.06 <br />437.43 <br />EP <br />19+48.87 <br />57,472.89 <br />38,184.20 <br />PC <br />19+73.16 <br />57,458.64 <br />38,203.87 <br />005-01-05 <br />21.68 <br />247.59 <br />EP <br />19+94.85 <br />57,446.70 <br />38,221.96 <br />PC <br />19+95.53 <br />57,446.35 <br />38,222.54 <br />024-09-37 <br />88.85 <br />210.70 <br />EP <br />20+84.37 <br />57,417.87 <br />38,306.01 <br />PC <br />20+89.58 <br />57,417.26 <br />38,311.18 <br />002-48-13 <br />0.49 <br />10.00 <br />EP <br />20+90.07 <br />57,417.21 <br />38,311.67 <br />SEE SHEET A240 FOR STAGE B LEAK DETECTION TRENCH 1 PLAN & PROFILE. <br />STAGE B LEAK DETECTION TRENCH 2 ALIGNMENT TABLE <br />STATION <br />NORTHING <br />EASTING <br />DELTA (D-M-S) <br />LENGTH (FT) <br />RADIUS (FT) <br />EP <br />0+00.00 <br />59,076.04 <br />37,919.11 <br />PC <br />1+29.25 <br />58,946.90 <br />37,924.38 <br />006-42-29 <br />5.50 <br />46.99 <br />EP <br />1+34.75 <br />58,941.40 <br />37,924.29 <br />PC <br />2+84.79 <br />58,791.79 <br />37,912.86 <br />006-12-12 <br />9.96 <br />92.03 <br />PC <br />2+94.76 <br />58,781.92 <br />37,911.56 <br />015-05-38 <br />8.25 <br />31.30 <br />EP <br />3+03.00 <br />58,773.71 <br />37,911.13 <br />PC <br />3+06.96 <br />58,769.76 <br />37,911.44 <br />010-46-32 <br />217.61 <br />1157.11 <br />EP <br />5+24.57 <br />58,552.49 <br />37,908.16 <br />PC <br />5+72.30 <br />58,505.05 <br />37,902.96 <br />070-09-24 <br />93.08 <br />76.02 <br />EP <br />6+65.38 <br />58,428.50 <br />37,945.08 <br />PC <br />6+73.16 <br />58,425.08 <br />37,952.07 <br />057-25-46 <br />121.20 <br />120.92 <br />EP <br />7+94.37 <br />58,330.12 <br />38,019.03 <br />PC <br />8+66.48 <br />58,258.46 <br />38,027.16 <br />017-59-29 <br />277.16 <br />882.66 <br />EP <br />11+43.64 <br />57,992.44 <br />38,100.78 <br />PC <br />11+83.77 <br />57,955.91 <br />38,117.39 <br />018-39-01 <br />69.71 <br />214.16 <br />EP <br />12+53.48 <br />57,888.92 <br />38,135.52 <br />PC <br />12+71.59 <br />57,870.90 <br />38,137.35 <br />028-56-16 <br />13.19 <br />26.12 <br />PC <br />12+84.79 <br />57,858.66 <br />38,141.88 <br />014-40-10 <br />233.59 <br />912.35 <br />EP <br />15+18.37 <br />57,685.78 <br />38,298.02 <br />SEE SHEET A240 FOR STAGE C LEAK DETECTION TRENCH 2 PLAN & PROFILE. <br />` * >! 375741J-R <br />�SJ�NAL�� <br />