|
STAGE B LEAK DETECTION TRENCH 1 ALIGNMENT TABLE
<br />STATION
<br />NORTHING
<br />EASTING
<br />DELTA (D-M-S)
<br />LENGTH (FT)
<br />RADIUS (FT)
<br />EP
<br />0+00.00
<br />59,081.69
<br />37,650.29
<br />PC
<br />0+07.12
<br />59,074.96
<br />37,652.61
<br />016-36-16
<br />14.05
<br />48.48
<br />EP
<br />0+21.17
<br />59,061.20
<br />37,655.21
<br />PC
<br />1+11.17
<br />58,971.28
<br />37,658.96
<br />006-45-40
<br />4.97
<br />42.10
<br />EP
<br />1+16.13
<br />58,966.31
<br />37,658.88
<br />PC
<br />2+40.07
<br />58,842.74
<br />37,649.44
<br />006-31-57
<br />1.14
<br />10.00
<br />EP
<br />2+41.21
<br />58,841.61
<br />37,649.29
<br />PC
<br />2+71.21
<br />58,812.15
<br />37,643.61
<br />016-20-35
<br />2.98
<br />10.45
<br />EP
<br />2+74.19
<br />58,809.19
<br />37,643.47
<br />PC
<br />3+09.61
<br />58,773.92
<br />37,646.83
<br />01 1-41-42
<br />164.58
<br />806.33
<br />EP
<br />4+74.20
<br />58,609.62
<br />37,645.67
<br />PC
<br />5+32.69
<br />58,551.48
<br />37,639.29
<br />045-15-58
<br />264.84
<br />335.22
<br />EP
<br />7+97.53
<br />58,303.95
<br />37,712.05
<br />PC
<br />8+01.47
<br />58,300.88
<br />37,714.53
<br />030-53-31
<br />9.88
<br />18.32
<br />EP
<br />8+11.35
<br />58,291.94
<br />37,718.44
<br />PC
<br />10+42.74
<br />58,062.87
<br />37,751.12
<br />003-07-12
<br />8.62
<br />158.25
<br />EP
<br />10+51.35
<br />58,054.31
<br />37,752.10
<br />PC
<br />11+55.56
<br />57,950.50
<br />37,761.19
<br />004-08-32
<br />5.80
<br />80.19
<br />EP
<br />11+61.36
<br />57,944.72
<br />37,761.48
<br />PC
<br />13+39.77
<br />57,766.32
<br />37,764.16
<br />009-13-56
<br />1.61
<br />10.00
<br />EP
<br />13+41.39
<br />57,764.72
<br />37,764.31
<br />PC
<br />13+65.49
<br />57,740.98
<br />37,768.53
<br />114-09-56
<br />19.93
<br />10.00
<br />EP
<br />13+85.42
<br />57,734.47
<br />37,784.01
<br />PC
<br />13+97.03
<br />57,741.00
<br />37,793.60
<br />002-12-34
<br />39.15
<br />1015.18
<br />EP
<br />14+36.18
<br />57,762.41
<br />37,826.38
<br />PC
<br />14+45.47
<br />57,767.34
<br />37,834.25
<br />003-26-37
<br />55.71
<br />926.99
<br />PC
<br />15+01.18
<br />57,795.47
<br />37,882.34
<br />087-51-02
<br />15.33
<br />10.00
<br />PC
<br />15+16.51
<br />57,791.80
<br />37,895.72
<br />004-02-35
<br />33.84
<br />479.63
<br />EP
<br />15+50.36
<br />57,763.35
<br />37,914.03
<br />PC
<br />16+04.71
<br />57,718.72
<br />37,945.05
<br />004-39-42
<br />44.73
<br />549.79
<br />EP
<br />16+49.44
<br />57,683.06
<br />37,972.04
<br />PC
<br />17+05.36
<br />57,639.89
<br />38,007.57
<br />004-49-23
<br />44.89
<br />533.23
<br />EP
<br />17+50.24
<br />57,606.47
<br />38,037.52
<br />PC
<br />18+07.58
<br />57,565.42
<br />38,077.56
<br />004-55-52
<br />45.48
<br />528.42
<br />EP
<br />18+53.06
<br />57,534.27
<br />38,110.67
<br />PC
<br />19+11.82
<br />57,495.88
<br />38,155.15
<br />004-51-13
<br />37.06
<br />437.43
<br />EP
<br />19+48.87
<br />57,472.89
<br />38,184.20
<br />PC
<br />19+73.16
<br />57,458.64
<br />38,203.87
<br />005-01-05
<br />21.68
<br />247.59
<br />EP
<br />19+94.85
<br />57,446.70
<br />38,221.96
<br />PC
<br />19+95.53
<br />57,446.35
<br />38,222.54
<br />024-09-37
<br />88.85
<br />210.70
<br />EP
<br />20+84.37
<br />57,417.87
<br />38,306.01
<br />PC
<br />20+89.58
<br />57,417.26
<br />38,311.18
<br />002-48-13
<br />0.49
<br />10.00
<br />EP
<br />20+90.07
<br />57,417.21
<br />38,311.67
<br />SEE SHEET A240 FOR STAGE B LEAK DETECTION TRENCH 1 PLAN & PROFILE.
<br />STAGE B LEAK DETECTION TRENCH 2 ALIGNMENT TABLE
<br />STATION
<br />NORTHING
<br />EASTING
<br />DELTA (D-M-S)
<br />LENGTH (FT)
<br />RADIUS (FT)
<br />EP
<br />0+00.00
<br />59,076.04
<br />37,919.11
<br />PC
<br />1+29.25
<br />58,946.90
<br />37,924.38
<br />006-42-29
<br />5.50
<br />46.99
<br />EP
<br />1+34.75
<br />58,941.40
<br />37,924.29
<br />PC
<br />2+84.79
<br />58,791.79
<br />37,912.86
<br />006-12-12
<br />9.96
<br />92.03
<br />PC
<br />2+94.76
<br />58,781.92
<br />37,911.56
<br />015-05-38
<br />8.25
<br />31.30
<br />EP
<br />3+03.00
<br />58,773.71
<br />37,911.13
<br />PC
<br />3+06.96
<br />58,769.76
<br />37,911.44
<br />010-46-32
<br />217.61
<br />1157.11
<br />EP
<br />5+24.57
<br />58,552.49
<br />37,908.16
<br />PC
<br />5+72.30
<br />58,505.05
<br />37,902.96
<br />070-09-24
<br />93.08
<br />76.02
<br />EP
<br />6+65.38
<br />58,428.50
<br />37,945.08
<br />PC
<br />6+73.16
<br />58,425.08
<br />37,952.07
<br />057-25-46
<br />121.20
<br />120.92
<br />EP
<br />7+94.37
<br />58,330.12
<br />38,019.03
<br />PC
<br />8+66.48
<br />58,258.46
<br />38,027.16
<br />017-59-29
<br />277.16
<br />882.66
<br />EP
<br />11+43.64
<br />57,992.44
<br />38,100.78
<br />PC
<br />11+83.77
<br />57,955.91
<br />38,117.39
<br />018-39-01
<br />69.71
<br />214.16
<br />EP
<br />12+53.48
<br />57,888.92
<br />38,135.52
<br />PC
<br />12+71.59
<br />57,870.90
<br />38,137.35
<br />028-56-16
<br />13.19
<br />26.12
<br />PC
<br />12+84.79
<br />57,858.66
<br />38,141.88
<br />014-40-10
<br />233.59
<br />912.35
<br />EP
<br />15+18.37
<br />57,685.78
<br />38,298.02
<br />SEE SHEET A240 FOR STAGE C LEAK DETECTION TRENCH 2 PLAN & PROFILE.
<br />` * >! 375741J-R
<br />�SJ�NAL��
<br />
|