My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-20_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-10-20_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:22:09 PM
Creation date
10/21/2025 10:01:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/20/2025
Doc Name Note
2. ISSUED FOR CONSTRUCTION DRAWINGS
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR153
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />r <br />V <br />V <br />J <br />V <br />n <br />Reference: <br />D NEWMONT PROVIDED THE 2020 FLYOVER DATA TO NEWFIELDS ON JAN. 13, 2021 IN THE <br />� FOLLOWING FILE: "Sft topo 9-1-20.DWG'. EXISTING GROUND INCLUDES FUTURE SCHIST <br />D ISLAND PIT CONFIGURATIONS. <br />FORESIGHT WEST PROVIDED THE AS —BUILT PHASE 2 TOP OF SLF SURFACE TO <br />D NEWFIELDS ON SEPT. 24, 2020 IN A FILE CALLED "Clay As —built thru 9-24-20.DWG" <br />0 <br />i <br />i <br />ma <br />MEN���` <br />ME <br />WAIF- <br />0 200 400 FEET <br />LEGEND: <br />EXISTING GROUND CONTOURS <br />EXISTING PHASE 3 STAGE A <br />GEOMEMBRANE LINER CONTOURS <br />PROPOSED PHASE 3 STAGE B GROUND <br />CONTOURS <br />PROPOSED PHASE 3 STAGE A GROUND <br />CONTOURS <br />EXISTING ROADS/TRAILS <br />4 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />_ — 12—"— 12— <br />12 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />18 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />24 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />PHASE 3 <br />STAGE A AND B HVSC <br />PIPES: <br />4 IN DIA. PERFORATED CPe <br />_ <br />COLLECTION PIPE <br />8 IN DIA. PERFORATED CPe <br />_ <br />COLLECTION PIPE <br />--1z--- 12- <br />12 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />18- <br />18 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />_ —24— —24- <br />24 IN DIA. PERFORATED CPe <br />COLLECTION PIPE <br />--ze--- 2s- <br />28 IN DIA. PERFORATED HOPE SDR11 <br />PIPE <br />NOTES: <br />1. PROPOSED CONTOURS REPRESENT TOP OF SOIL <br />LINER FILL WITHIN THE GEOMEMBRANE LIMITS <br />AND FINISHED GRADE EVERYWHERE ELSE. <br />2. THE GEOMEMBRANE LIMITS ARE SHOWN ON DWG <br />A160. <br />��� •� • NEy. <br />O •: <br />>! 3757 <br />a� <br />:ss•• ......�c, <br />�J�NAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.