Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grade to 3H:1V Slope <br /> Site: Pino Pit Permit Action: 2025 Inspection Permit/Job#: M2000118 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 10/7/2025 County: Huerfano Filename: 1 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.39 NA <br /> Operating Cost/Hour: $80.69 100 <br /> Ripper own. $9.58 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $1.42 25 <br /> Operator Cost/Hour: $38.02 NA <br /> Total unit Cost/Hour: $227.09 <br /> Total Fleet Cost/Hour: $454.18 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 19,200 <br /> Swell factor: 1.125 <br /> Loose volume: 21,600 LCY <br /> Source of estimated volume: DRMS 35'deep 1600'long highwall near vertical <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly 826.1 LCY/hr <br /> production: <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push -20% <br /> gradient: <br /> Average site altitude: 6,100 feet <br /> Material weight: 2,6501bs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />