My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-21_REVISION - M2000118
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000118
>
2025-10-21_REVISION - M2000118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 8:53:18 AM
Creation date
10/21/2025 10:28:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000118
IBM Index Class Name
Revision
Doc Date
10/21/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Oldcastle SW Group, Inc. Attn: Sara Weimer
Type & Sequence
SI3
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2025 Reclamation Cost Summary <br /> Site: Pino Pit Permit Action: 2025 Inspection Permit/Job#: M2000118 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/7/2025 County: Huerfano Filename: M118-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade to 31-1:1V Sloe DOZER 2 14.14 $6,422 <br /> 002 Replace Overburden SCRAPERI 1 37.73 $62,067 <br /> 003 Re lace 4"of topsoil on 40 acres SCRAPERI 1 16.97 $27,746 <br /> 004 Ripping 15 acres RIPPER 2 11.88 $5,501 <br /> 005 Reve etation of 40 acres REVEGE 1 40.00 $104,227 <br /> 006 Mobilization/Demobilization MOBILIZE 1 3.71 $8,485 <br /> SUBTOTALS: 124.43 $214,448 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $4,332 <br /> Performance bond: 1.05 Total= $2,252 <br /> Job superintendent: 62.22 Total= $4,674 <br /> Profit: 10.00 Total= $21,445 <br /> TOTAL O&P= $32,703 <br /> CONTRACT AMOUNT(direct+O&P)= $247,151 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $10,504 <br /> Reclamation management and/or administration: 5.00 $12,358 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $56,064 <br /> TOTAL BOND AMOUNT(direct+indirect)= $270,512 <br />
The URL can be used to link to this page
Your browser does not support the video tag.