Permit Number: C1982057 Page 4 of 20 <br />Phase III <br /> <br />Table 1. Summary of Past Bond Releases at Seneca II W Mine and Acreage Adjustments <br />Submittal Proposed <br />Decision <br />Date(s) <br />Released <br />Area Ph I <br />(acres) <br />Released <br />Area Ph II <br />(acres) <br />Released <br />Area Ph III <br />(acres) <br />Reduction in <br />Liability <br />SL01 Withdrawn $0.00 <br />SL02 5 May 2010 721.90 0.0 $2,038,488.00 <br />SL03 21 March 2011 412.35 0.0 $2,335,430.00 <br />SL04 19 Dec 2013 127.65 0.0 0.0 $801,465.00 <br />SL05 27 Aug 2014 0.0 800.9 - *1 0.0 $87,927.00 <br />SL06 24 March 2021 0.0 379.5 816.6 $2,396,812.54 <br />SL07 8 April 2021 2.89 - *2 367.0 $1,077,186.14 <br />SL8 *3 PENDING 29.60 107.9 107.9 $316,698.60 <br />*1 – There was a discrepancy identified in the acreages approved for Phase II release documented for SL5. The SL5 August 27, 2014, Findings <br />Document found 800.9 acres were eligible for Phase II bond release. However, the Division’s Proposed Decision Form and database incorrectly <br />documented 800.8 acres were released. This is corrected with this SL8 Findings Document. <br />*2 – Pond 009 was included in the SL7 Phase Bond Release Application, this area accounted for 2.89 acres of disturbance. Pond 009 is a <br />permanent impoundment and was approved to remain in place post-mining. DRMS approved this area for Phase III bond release with SL7. <br />However, this area has not received Phase II bond release previously, therefore was not included in the SL7 Phase II bond release acreage total. <br />This is corrected with this SL8 Findings Document. <br />*3 - Approximately 1,291.5 acres have been reported to have been affected at the site. With the approval of SL8, the total cumulative Phase I <br />release area will be 1,291.5 acres, Phase II will be 1,291.19 acres, and Phase III will be 1,291.5 acres. The .31-acre discrepancy of Phase II <br />acreage is likely due to rounding differences in parcel acreages and tracking. <br /> <br />The application was received by the Division on 9 October 2024. The application was deemed complete on 16 <br />October 2024. SPL published notice of the bond release application in Colorado Mountain News Media <br />Steamboat Pilot once weekly for four consecutive weeks, beginning 11 September 2024. SPL also notified <br />landowners within and adjacent to the mine permit area, and other interested parties of the application for bond <br />release, as required by Rule 3.03.2(1). No comments, written objections, or requests for an informal conference <br />regarding the bond release application were received by the Division. <br /> <br />The Division scheduled and conducted a bond release inspection on 5 June 2025. The site inspection was <br />conducted in accordance with Rule 3.03.2(2). The Division notified the operator, surface owners, Bureau of <br />Land Management (BLM), the Office of Surface Mining Reclamation and Enforcement (OSMRE), and the <br />Colorado State Land Board of the inspection via certified mail. Attendees included: <br /> <br />o Miranda Kawcak, Seneca Properties LLC (SPL) <br />o Dan Mackinnon, Office of Surface Mining Reclamation and Enforcement (OSMRE) <br />o Tom Cummings, Bureau of Land Management (BLM) <br />o Ms. Takasugi, Landowner <br />o Mr. Armbuster, Landowner <br />o Jared Ebert, Colorado Division of Reclamation, Mining, and Safety (DRMS) <br />o Robin Reilley, MS, GISP; (DRMS) <br />