Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # A1005 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: AGVLF -Topsoil - Dozer Spreading <br />Site: Cresson Project Permit Action: AM14 Permit/Job#: M1980244 <br /> <br />PROJECT IDENTIFICATION <br />Task #: A1005 State: Colorado Abbreviation: None <br />Date: 10/1/2025 County: Teller Filename: AM14-A1005 <br />User: ERR <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II LGP <br />Horsepower: 240 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $97.39 NA <br />Operating Cost/Hour: $80.69 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 25 <br />Operator Cost/Hour: $38.02 NA <br />Total unit Cost/Hour: $216.10 <br />Total Fleet Cost/Hour: $216.10 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 25,997 <br />Swell factor: 1.215 <br />Loose volume: 31,586 LCY <br />Source of estimated volume: AM14 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 260 feet <br />Unadjusted hourly production: 222.5 LCY/hr <br /> <br />Materials consistency description: Loose stockpile 1.2 <br /> <br />Average push gradient: -30 % <br />Average site altitude: 9,500 feet <br /> <br />Material weight: 1,600 lbs/LCY <br /> <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.)