Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # A1004 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2000.00 -0.60 3.00 2.40 3328 1.578 <br />Haul Time: 1.578 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2000.00 0.60 3.00 3.60 3411 0.874 <br />Return Time: 0.874 minutes <br />Total Truck Cycle Time: 6.284 minutes <br />Loading Tool unit <br />Production <br /> <br />1,605.09 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,332.22 <br /> <br />LCY/Hour <br />Truck Unit Production <br />672.22 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />557.94 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 1,115.89 LCY/Hour <br />Adjusted single truck/loader team production: 1,115.89 LCY/Hour <br />Adjusted multiple truck/loader team production: 1,115.89 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 28.31 Hours <br /> <br />Unit cost: <br /> <br />$1.899 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$59,993 <br />