Laserfiche WebLink
0 NA <br /> 7 Spread topsoil and final grading and harrowing of 5 $1,471 <br /> topsoil, upper zone only, (3872 cy @$0.38/cy). <br /> 8 Seed& mulch wetland(0.52 acres @$3500/acre) 0 NA <br /> No knew wetlands, since none will be disturbed <br /> therefore seeding and mulching of wetlands area <br /> is unnecessary. <br /> 19 Seed and fertilize(3.6 acres@$316/acre)Drill 2 $1,140.00 <br /> seed on flat areas. <br /> Total Direct Costs Unknown at $3,511.00 <br /> this time <br /> DMG Costs (19.5% x direct costs) $684.65 <br /> Total Bond Amount $4,195.65 <br /> There are no costs for removal of equipment since there will be no permanent equipment, struc- <br /> tures or foundations within the permit area. DMG overhead consists of contractor profit,bid prepa- <br /> ration,etc. and are estimated at 19.5%of direct costs. <br /> Map Exhibit E-2 shows the site after full reclamation. The cross-section lines A and B are used to <br /> show the original and final topography. These cross-sections are given on Map E-3. <br /> No wetlands will be disturbed so no revegetation seed mix for the wetlands will be needed or <br /> required. <br /> 30 <br /> North Fork Pit March 04 <br />