My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-26_REVISION - M2004025 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004025
>
2025-09-26_REVISION - M2004025 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 3:25:29 PM
Creation date
9/29/2025 8:19:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Revision
Doc Date
9/26/2025
Doc Name
Request for Technical Revision
From
Farnsworth Construction and Gravel Company
To
DRMS
Type & Sequence
TR2
Email Name
RDZ
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Worst Case Reclamation Costs and Timetable(After Substitute Water Supply Plan in <br /> Place) <br /> No wetlands will be created since no wetlands will be disturbed, since the existing pond will not be <br /> mined. <br /> A court adjudicated augmentation plan and substitute water supply plan have been obtained at this <br /> time. Therefore, no backfill of the lake area will be required and should not be included in the <br /> reclamation costs. Slopes will need to be graded to 3H:1V and seeded. <br /> Task# Description Time(days) Cost <br /> 1 Dewater Phase 1 to allow full reclamation. 0 NA <br /> 2 After removing all portable facilities, partially 0 NA <br /> backfill pit to 2' above the equilibrium water level <br /> using excess overburden in the temporary stock- <br /> pile located in the pit area itself from stripping <br /> Augmentation plan allows the lake to remain and <br /> none needs to be backfilled <br /> 3 There will not be import of backfill material since 0 NA <br /> an augmentation plan is in place for lake to <br /> remain. <br /> 4 Remove concrete bridge supports and use 980 0 NA <br /> Loader to remove 2 bridge sections. Smooth out <br /> gravel berms and support areas. A bridge will not <br /> be put in, a land bridge which exists during low <br /> flow months will be used and left in its natural <br /> state. <br /> 5 Create shelf wetland surface on north side of lake 0 NA <br /> (0.40 acres)Doze 3' of existing fill (1936 cy) @ <br /> $0.50 per cy. Wetlands will not be created, <br /> because no wetlands will be disturbed <br /> 6 Rip 3.6 acres to depth of 2.0 feet prior to topsoil- 2 $900 <br /> ing. Cost= $250/acre <br /> 29 <br /> North Fork Pit March 04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.