Laserfiche WebLink
Natural Soda LLC 2024 Project Status Report & Annual Plan of Development <br /> 16 January 2025 <br /> <br /> <br />The current status of wells associated with the NS Project is presented in Table 3: <br />List and Status of Wells Associated with NS. <br />4.1.5. Other Activities <br />Continuous water level monitoring of proximal DS aquifer monitor wells, using fluid level <br />indicators (pressure transducers), provided real time data for the management of active <br />production mining interval operations. Throughout 2024, injection and recovery rates <br />were adjusted to maintain water levels of these monitoring wells near target zones. <br />