Natural Soda LLC 2024 Project Status Report & Annual Plan of Development <br /> 13 January 2025 <br /> <br />4.0 2024 Project Activities <br />4.1. On-Site Facilities and Process Description <br />4.1.1. General Arrangement <br />(Figure 5 provides an overview of the NS process flow.) <br />4.1.2. Lab Operation / Sanitation / ISO <br />In 2024, activities continued in the NS laboratory to provide analysis for process control, <br />quality assurance, and regulatory requirements. <br />• Plant operators performed process control analyses. <br />• Chloride levels were monitored by both operations and laboratory personnel on <br />USP grades to ensure USP standards were met. <br />• The USP test for insoluble materials was conducted on a per lot basis by <br />laboratory personnel and a filter test for insoluble materials was conducted on <br />the dry product once per shift by NS operators. <br />• Pests were controlled with the use of two UV bug lights and rodent traps around <br />the interior and exterior walls of the plant. Bait stations replaced external traps at <br />the Rifle warehouse. <br />• GMP/ISO/Sanitation training was provided for employees as required. <br />• A food safety audit for FSSC 22000 was conducted for which NS maintained <br />GFSI certification. <br />• CDPHE, NSF, OMRI, Kosher, Halal, Non-GMO, CleanGredients and ISO 9001 <br />certifications were maintained. <br />4.1.3. Process, Utilities, Facilities <br />• On March 5, 2024, NS noted a pinhole leak in the barren pipeline fitting weld. <br />This small leak affected soil near the southwest portion of the parking lot area <br />and was contained within a soil berm. The leak was repaired, and the affected <br />soil was disposed of properly. NS submitted a Report of Undesirable Event to <br />BLM and DRMS the same day the leak was identified and followed up with <br />agencies on remediation options. <br />• June 10 – 17, the NS plant underwent the yearly common outage, where all <br />production wells were shutdown. NS boiled out both production trains and <br />completed annual maintenance and inspections on common systems (boilers, <br />electrical switchgear, cooling tower, wellfield pipelines, etc.). <br />• The NS truck scale removal and replacement project began on June 10th. The <br />replacement was successful, and the scale began operations on June 20th. <br />