My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-28_HYDROLOGY - M1983194 (7)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983194
>
2025-08-28_HYDROLOGY - M1983194 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 10:36:58 AM
Creation date
9/9/2025 9:21:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
8/28/2025
From
NSI
To
EPA
Archive
No
Tags
Unknown Indexing
Description:
Use tag when unsure of document indexing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC 2024 Project Status Report & Annual Plan of Development <br /> 12 January 2025 <br />o 18H-IR-W MIT P2 (initial) will be conducted, as appropriate following <br />connection of the well with the 18H-1V well in 2025. <br /> <br />3.2.4. EPA Notification – Schedule of Planned Surface Subsidence <br />Monuments (SSM) Survey (Confidential) <br />• NS will conduct the biennial surface subsidence monument survey in the <br />second quarter of 2025. The results will be reported in section 4.4.2 of the <br />annual report in January of 2026 in accordance with UIC Permit C030358- <br />00000 requirements. <br /> <br />3.2.5. EPA Notification – Schedule of Planned Subsurface <br />Subsidence Monitor Well (SSMW) Logging (GR/CCL) <br />(Confidential) <br />• Per EPA UIC Permit C030358-00000 requirements; routine subsurface <br />subsidence monitor well (SSMW) logging (GR/CCL) is planned for 2025 or the <br />first quarter of 2026: <br />o NS will log the 14H-1V SSMW in the 3rd or 4th quarter of 2025. This will <br />be the final SSMW log for this well that monitors the P&A’ed 14H mining <br />interval. Following logging, the 14H-1V SSMW will be P&A’ed. <br />o Per UIC Permit, SSMW logging is determined based on mining interval <br />production, NS will notify the EPA of upcoming SSMW logging as <br />production milestones come into focus. <br />
The URL can be used to link to this page
Your browser does not support the video tag.