My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-28_HYDROLOGY - M1983194 (7)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983194
>
2025-08-28_HYDROLOGY - M1983194 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 10:36:58 AM
Creation date
9/9/2025 9:21:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
8/28/2025
From
NSI
To
EPA
Archive
No
Tags
Unknown Indexing
Description:
Use tag when unsure of document indexing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC 2024 Project Status Report & Annual Plan of Development <br /> 8 January 2025 <br /> <br />3.1.4. Regulatory Review (Confidential) <br />NS submitted routine Sundry Notices, monthly, quarterly, and annual reports to the <br />appropriate agencies. The following summarizes other regulatory related activities: <br />Bureau of Land Management (BLM) <br />• March 5, 2024, NS reported an Undesirable Event to the BLM with regards to a <br />pinhole leak in the brine pipeline that leaked sodium bicarbonate brine onto <br />undisturbed ground. NS contained the leaked fluids with a soil berm and cleaned <br />up the affected soil and reclaimed the area per agency guidelines. <br />• In April 2024 NS submitted an APD application package for the 19H-1V and 19H- <br />IR-E proposed production wells. <br />• In May 2024 NS reported two notifications (May 6 and 14th) of migratory waterfowl <br />encounters to the U.S. Fish and Wildlife Service (FWS) at the time of the events. <br />BLM requested to be notified of the same events moving forward and were <br />notified of these events on July 9, 2024. <br />• All required drilling commencement and cementing operational notifications were <br />supplied to the BLM by NS as required for the 18H-1V and 18H-IR-W production <br />well operations in June 2024. <br />• NS submitted BLM a request for the P&A of the 18H-IR-WA production well July <br />1, 2024, the BLM granted approval July 29, 2024. NS submitted P&A completion <br />documents following the 18H-IR-WA P&A operations in August 2024. <br />• NS submitted an APD application for the 18H-IR-W production well redrill <br />operation in July 2024, the BLM approved the APD on August 1, 2024. The 18H- <br />IR-W production well was redrilled in October 2024. <br />• In August 2024 NS submitted a Use Permit Application to the BLM for Lot Three <br />of Section 36 to maintain access to the proposed 19H East pad location to be <br />constructed in 2025. <br />• Completion data and Form 3160-4 (well completion) were submitted to the BLM <br />for the 18H-1V Slant Production well in December 2024. <br /> <br />United States Environmental Protection Agency (EPA) <br />• January 11, 2024, NS sent EPA all documentation for the DS-3 Subsurface <br />Subsidence Monitor Well (SSMW) geophysical logging and analysis required for <br />the 12H and 13H mining intervals. Logging occurred on January 9, 2024, and <br />indicated no subsurface subsidence. <br />• NS submitted an application package to add the proposed 19H-IR-E Horizontal <br />Production well to the NS UIC area permit CO30358-00000 on April 10, 2024. <br />The application was approved by the EPA on June 22, 2024, and assigned <br />injection permit # C030358-12756 to the 19H-IR-E well.
The URL can be used to link to this page
Your browser does not support the video tag.