Laserfiche WebLink
Natural Soda LLC 2023 Project Status Report & Annual Plan of Development <br /> 17 January 2024 <br /> <br />• P&A operations occurred on the 15H-I production well between August 11 <br />through the August 18, 2023. The casing was cut below ground level and a <br />final P&A marker was installed in October, 2023. <br />• P&A operations occurred on the 14H-R(I) production well between August 16 <br />through the August 29, 2023. The casing was cut below ground level and a <br />final P&A marker was installed in September, 2023. <br />The current status of wells associated with the NS Project is presented in Table 3: <br />List and Status of Wells Associated with NS. <br />4.1.5. Other Activities <br />Continuous water level monitoring of proximal DS aquifer monitor wells, using fluid level <br />indicators (pressure transducers), provided real time data for the management of active <br />production mining interval operations. Throughout 2023, injection and recovery rates <br />were adjusted to maintain water levels of these monitoring wells near target zones. <br />