My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS 2023 Annual Report For EPA
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983194
>
NS 2023 Annual Report For EPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 9:21:26 AM
Creation date
9/9/2025 9:13:42 AM
Metadata
Fields
Template:
DRMS Permit Index
IBM Index Class Name
Hydrology
Doc Date
8/28/2025
Archive
No
Tags
Unknown Indexing
Description:
Use tag when unsure of document indexing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC 2023 Project Status Report & Annual Plan of Development <br /> 17 January 2024 <br /> <br />• P&A operations occurred on the 15H-I production well between August 11 <br />through the August 18, 2023. The casing was cut below ground level and a <br />final P&A marker was installed in October, 2023. <br />• P&A operations occurred on the 14H-R(I) production well between August 16 <br />through the August 29, 2023. The casing was cut below ground level and a <br />final P&A marker was installed in September, 2023. <br />The current status of wells associated with the NS Project is presented in Table 3: <br />List and Status of Wells Associated with NS. <br />4.1.5. Other Activities <br />Continuous water level monitoring of proximal DS aquifer monitor wells, using fluid level <br />indicators (pressure transducers), provided real time data for the management of active <br />production mining interval operations. Throughout 2023, injection and recovery rates <br />were adjusted to maintain water levels of these monitoring wells near target zones. <br />
The URL can be used to link to this page
Your browser does not support the video tag.