Laserfiche WebLink
Natural Soda LLC 2023 Project Status Report & Annual Plan of Development <br /> 13 January 2024 <br /> <br />3.2.5. EPA Notification – Schedule of Planned SSMW Logging <br />(GR/CCL) (Confidential) <br />• Per EPA UIC Permit C030358-00000 requirements; routine subsurface <br />subsidence monitor well (SSMW) logging (GR/CCL) is planned for 2024 or <br />the first quarter of 2025: <br />o NS logged the DS-3 well on January 9, 2024 to collect SSMW CCL/GR <br />logs. The DS-3 monitor well serves as a GMW and SSMW for the 12H <br />and 13H mining intervals. Comparison of 2002, 2011 and 2024 CCL/GR <br />logs indicated no subsurface subsidence in the DS-3 well. <br />o Per UIC Permit, SSMW logging is determined based on mining interval <br />production, NS will notify the EPA of upcoming SSMW logging as <br />production milestones become more clear. <br />