My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-05_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2025-09-05_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 7:58:50 AM
Creation date
9/5/2025 3:11:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
9/5/2025
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining, Inc
Inspection Date
8/28/2025
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 28, 2025 C-1981-010/Trapper Mine JLE <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 10 <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Jennings (J) Pit East has been stripped of topsoil. If this area is not to be mined, topsoil must be redistributed over <br />the affected area in accordance with TMI’s approved reclamation plan, Rule 4.06.4 and Rule 4.13. Per the M10B <br />series map, portions of this pit are to have topsoil replaced in 2025 in addition to what should have been replaced <br />in 2023. <br /> <br />Colt (C) Pit appears to have been stripped of topsoil. This area is no longer going to be mined according to TMI’s <br />approved operation plan; therefore, topsoil must be redistributed over the affected area in accordance with TMI’s <br />approved reclamation plan and Rule 4.06.4. <br /> <br />Derringer (D) Pit has been backfilled and graded. According to the Map M10B series, D Pit was to be topsoiled in <br />2023. TMI has spread topsoil over most of the D Pit area, but it is not complete. As this was to have been <br />completed in 2023 in accordance with the approved plan, TMI must complete topsoiling D Pit in 2025, in <br />accordance with Rule 4.06.4, TMIs approved reclamation timeframes, and Rule 4.13. <br /> <br /> <br />DOCUMENTS RECEIVED – NA <br />OTHER (SPECIFY) - NA <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.