My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-21_HYDROLOGY - M2008082 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2025-07-21_HYDROLOGY - M2008082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 7:37:04 AM
Creation date
7/30/2025 10:02:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
7/21/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes Substitute Water Supply Plan Renewal (Amended) <br /> July 21, 2025 <br /> Page 10 of 17 <br /> Wastewater Treatment Plant (MWWTP)) (WDID 0200700) in the SW '/ of the SW '/ of Section <br /> 1, Township 3 South, Range 68 West of the 6th P.M. A transit loss of 0.5% per mile is currently <br /> assessed from April through October and a transit loss of 0.25% per mile is currently assessed <br /> during November through March for delivery of water down the South Platte River. Such <br /> transit losses are subject to modification by the Division Engineer. The MWWTP is located <br /> approximately 25 miles upstream of the confluence of the South Platte River and Big Dry <br /> Creek where the mining depletions will accrue to the river, therefore the total transit loss <br /> will be 12.5% during the irrigation season and 6.25% during the non-irrigation season. <br /> Replacement supplies from Aurora include transit loss, so all Morton Lakes and Holton Lakes <br /> depletions are fully replaced at the point of depletions through December 31, 2025. <br /> The Applicant shall ensure that the replacement water makes it to the point of depletion or <br /> to the location of the calling water right located below the Morton and Holton Lakes point(s) <br /> of depletion. The Division Engineer, or their designated representative, will administer all <br /> such water transported in the South Platte River or its tributaries, including water for <br /> replacement of depletions, past intervening headgates to ensure that such water is not <br /> intercepted or otherwise diminished in quantity by diversion, use or other interference by <br /> intervening water rights and to assure that such water remains available and suitable for <br /> Applicant's uses under this plan, except when any intervening headgate is diverting the <br /> entire flow of ("sweeping") the river. In the event that delivery past headgates which <br /> sweep the river requires the installation of a bypass structure or the use of an existing <br /> bypass structure by agreement with a third-party, Applicant is responsible for either <br /> installing a new bypass structure with a continuous recording measuring device(s) as <br /> approved by the Water Commissioner or securing an agreement with a third-party to use an <br /> existing bypass structure and providing such information and agreement to the Division <br /> Engineer. <br /> Conditions of Approval <br /> I hereby approve this proposed SWSP in accordance with section 37-90-137(11 ), C.R.S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.