Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Three monitoring wells are to be drilled for the collection of baseline groundwater quality and quantity data to <br /> satisfy munituhng mclaiienients fion, the state for the Slick Ruck paject.Activities will include pupatation of drill <br /> pads and the drilling, installation,development, and completion of the monitoring wells,followed by the reclamation <br /> of the d,011 pad. D,illing will be pe,foi ined by a coi itiactui lice,ised i,, tlie,state of ealumdo to di a" mitul we"S. <br /> Existing roads will be used to reach the well location.The proposed drill pads will be equal to or less than 25'x40', <br /> ppioximately 1,888 seltime feet. A di"' stimp, also described as a nitid pit,will be used.The nitid p t and <br /> associated spoils will be contained within the drill pad area footprint.Additional areas within the drill pad will be <br /> used for the dFill hale C011OF and allow feF a wE)Fl(Wee that is adequate to eaptUFe and contain any spilled drilling <br /> fluids. Drilling fluids will consist of water supplied from a water truck.The water monitoring wells are intended to <br /> Wration fGF appFOXimately 16 yeaFs befE)Fe being plugged and abandoned.The MOnROFing wells will <br /> adhere to the Construction Standards outlined in 2 CCR 402-2 Section 14.3. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 4 Width (ft) 25 Length (ft) 40 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 4 Depth (ft) 1 ,000 (in) ^-1 0 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 4 Width (ft) 4 Length (ft) 8 Depth (ft) 6 <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> N/A <br /> Form 2—Public File Page 6 of 14 <br />