Laserfiche WebLink
E. Other Disturbances (please describe) <br /> Three to four groundwater monitoring and observation wells will be installed to establish <br /> baseline aquifer parameters. I he wells will e permitted with e State Engineer by filing <br /> a notice of intent and will adhere to the Construction Standards outlined in 2 CCR 402-2 <br /> Section 14.3. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Fuel will be stored in vehicle tanks. No bulk fuel will be stored on site. If freezing <br /> temperatures exist during the project, propane for equipment heating and thawing will e <br /> stored in 5-gallon portable tanks and stored in an enclosed trailer when not in use <br /> Drilling water will be stored in truck-mounted 2,000 to 4,000 gallon water tanks and <br /> hauled to tl ie drill sites. <br /> G. New Roads: <br /> Length (ft): NSA Width (ft): <br /> Significantly <br /> Upgraded Roads Length (ft): NSA Width (ft): <br /> Are culverts or other crossings proposed? If so, please describe: <br /> None <br /> H. Total project area to be disturbed (acres) 0.09 acres <br /> I. Describe the equipment to be used for the prospecting operations: <br /> 1x rubber-tired backhoe loader(Cat 420 or similar) <br /> 1x rubber-tired truck mounted drilling rigs(DOT legal highway weight) <br /> 1-2x 2,000-4,000 gallon water trucks(DOT legal highway weight) <br /> I enclosed trailer for parts and tool storage <br /> 1x highway legal pickup truck for geophysical logging <br /> 2-4x highway legal passenger vehicles for crew transportation support and project supervision <br /> All equipment will be staged along existing two-track access roads in the vicinity of the drill sites when not involved in the immediate drilling <br /> operation. <br /> Form 2—Public File Page 7 of 14 <br />