My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-14_REVISION - M2017007
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017007
>
2025-07-14_REVISION - M2017007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 8:52:08 AM
Creation date
7/14/2025 8:45:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
Revision
Doc Date
7/14/2025
Doc Name
Notice of Surety Increase
From
Colorado Crushing, Inc. Rockford (Rocky) Ryan
To
DRMS
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#004 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil 3"over 32.9 acres <br /> Site: Perrino Pit Permit Action: 2025 Inspection Permit/Job#: M2017007 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 6/26/2025 County: Huerfano Filename: 4 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA 25 <br /> Ownership cost/hour: $442.19 NA NA NA NA $11.65 <br /> Operating cost/hour: $252.89 NA NA NA NA $5.61 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA NA NA NA $0.00 <br /> Ripper op.cost/hour: NA NA NA NA NA $0.00 <br /> Operator cost/hour: $30.90 NA NA NA NA $0.00 <br /> Unit Subtotals: $725.98 NA NA NA NA $17.26 <br /> Number of Units: 1 0 0 0 0 1 <br /> Group Subtotals: Work: $725.98 Support: $0.00 Maint: $17.26 <br /> Total work team cost/hour:$743.24 <br /> MATERIAL QUANTITIES <br /> Initial volume: 13,300 CCY Swell factor: 1.000 <br /> Loose volume: 13,300 LCY <br /> Source of estimated volume: 32.9 acres covered with 3-inches of topsoil <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.