My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-14_REVISION - M2017007
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017007
>
2025-07-14_REVISION - M2017007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 8:52:08 AM
Creation date
7/14/2025 8:45:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
Revision
Doc Date
7/14/2025
Doc Name
Notice of Surety Increase
From
Colorado Crushing, Inc. Rockford (Rocky) Ryan
To
DRMS
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Grade Shape 35 acres <br /> Site: Perrino Pit Permit Action: 2025 Inspection Permit/Job#: M2017007 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 6/26/2025 County: Huerfano Filename: 3 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 140M Horsepower: 183 <br /> Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $77.29 NA <br /> Operating Cost/Hour: $56.87 100 <br /> Ripper Ownership Cost/Hour: $0.00 NA <br /> Ripper Operating Cost/Hour: $0.00 <br /> Operator Cost/Hour: $27.76 NA <br /> Total Unit Cost/Hour: $161.92 <br /> Total Fleet Cost/Hour: $161.92 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 35.00 acres <br /> Source of estimated acreage: Operator Provided <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Finish grading(0-2.5 mph)- 1.5 <br /> Selected Blade Angle: 0 degrees <br /> Effective Blade Length: 12.00 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 10.00 feet <br /> Unadjusted Hourly Unit Production: 1.8182 acres/hour <br /> Job Condition Correction Factors Site Altitude: 6400 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (1sh/d,fay.) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 1.6364 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.6364 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 21.39 Hours <br /> Unit cost: $98.95 per acre Total job cost: $3,463 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.