Bond Review PDYSGCK Page 36 of <br /> 167 <br /> MATERIAL QUANTITIES <br /> Initial volume: 9,680 CCY Swell factor: 1.090 <br /> Loose volume: 10,551 LCY <br /> Source of estimated volume: Division of Reclamation, Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Pa.. l�weigh! Basis: <br /> Material weight: 2,400 Pounds/LCY <br /> Description: Clay and gravel - Dry <br /> Rated Payload: 82,000 Pounds <br /> Payload Capacity: 34.17 LCY <br /> Truck Bed(volume) Basis: <br /> Struck Volume: 21.60 LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br /> Adjusted Volume: 31.70 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 30.36 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 9.200 LCY (heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures 100-120% 1.100 <br /> Adjusted Capacity: 10.120 LCY <br /> Job Condition Corrections: Site Altitude (ft.): 6800 feet <br /> Truck Loader Source <br /> Altitude AdJ: 1.000 1.000 CAT HB <br /> Job Efficiency: 0.830 0.830 CAT HB <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required 3 passes <br /> to Fill Truck: <br /> CIRCES Cost Estimating Software <br />