Laserfiche WebLink
Bond Review PDYSGCK Page 35 of <br /> 167 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Remove Gravel from Main North Facilities Area <br /> Peabody Sage Creek Permit Action: <br /> Site: Mine BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task#: 021 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: 021 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team -Truck: Cat 770D <br /> -Loader: CAT 988H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Motor Water <br /> Area Grader Truck <br /> %Utilization- 100 95 NA NA 25 25 <br /> machine: <br /> Ownership $116.19 $131.26 NA NA $129.81 $111.67 <br /> cost/hour: <br /> Operating $85.60 $95.11 NA NA $22.28 $29.61 <br /> cost/hour: <br /> %Utilization- NA 0 NA NA NA NA <br /> riper: <br /> Ripper own. NA $0.00 NA NA $0.00 $0.00 <br /> cost/hour: <br /> Ripper op. NA $0.00 NA NA $0.00 $0.00 <br /> cost/hour: <br /> Operator $25.24 $36.85 NA NA $27.76 $21.12 <br /> cost/hour: <br /> Unit Subtotals: $227.03 $263.23 NA NA $179.85 $162.40 <br /> Number of Units: 6 1 0 0 1 1 <br /> Group Subtotals: Work: $1,625.41 Support: $0.00 Maint: $342.25 <br /> Total work team cost/hour: $1,967.66 <br /> CIRCES Cost Estimating Software <br />