My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_REVISION - C2009087 (37)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2025-07-09_REVISION - C2009087 (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:41:42 AM
Creation date
7/10/2025 9:44:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN3
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Review PDYSGCK Page 7 of 167 <br /> Return Time: 0.466 minutes <br /> Total Truck Cycle Time: 4.343 minutes <br /> Loading Tool unit <br /> Production 811.40 LCY/Hour Adjusted for j ob efficiency: 673.46 LCY/Hour <br /> Truck Unit <br /> Production 419.43 LCY/Hour Adjusted for j ob efficiency: 348.13 LCY/Hour <br /> Optimal No. of 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Trucks: <br /> Adjusted hourly truck team production: 696.26 LCY/Hour <br /> Adjusted single truck/loader team production: 673.46 LCY/Hour <br /> Adjusted multiple truck/loader team production: 2,020.39 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 3 Team(s) Total job time: 102.12 Hours <br /> Unit cost: $1.389 /LCY Total job cost: $286,655 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.