Laserfiche WebLink
Bond Review PDYSGCK Page 7 of 167 <br /> Return Time: 0.466 minutes <br /> Total Truck Cycle Time: 4.343 minutes <br /> Loading Tool unit <br /> Production 811.40 LCY/Hour Adjusted for j ob efficiency: 673.46 LCY/Hour <br /> Truck Unit <br /> Production 419.43 LCY/Hour Adjusted for j ob efficiency: 348.13 LCY/Hour <br /> Optimal No. of 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Trucks: <br /> Adjusted hourly truck team production: 696.26 LCY/Hour <br /> Adjusted single truck/loader team production: 673.46 LCY/Hour <br /> Adjusted multiple truck/loader team production: 2,020.39 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 3 Team(s) Total job time: 102.12 Hours <br /> Unit cost: $1.389 /LCY Total job cost: $286,655 <br /> CIRCES Cost Estimating Software <br />