Laserfiche WebLink
Bond Review PDYSGCK Page 6 of 167 <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs. Job Condition NA <br /> Rating: <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements (min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load, 0.575 minutes <br /> dump, maneuver): <br /> Cycle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 Cat HB <br /> Stockpile: Conveyor or dozer piled 10 ft. high <br /> 0.00 0.000 (Cat HB) <br /> and a <br /> Truck Ownership: Common ownership of trucks and -0.040 (Cat HB) <br /> loaders -0.04 <br /> Operation: Constant operation -0.04 -0.040 Cat HB <br /> Dump Target: Nominal target 0.00 0.000 Cat HB <br /> Net Cycle Time Adjustment: -0.060 minutes <br /> Adjusted Loader Cycle Time: 0.515 minutes <br /> Net Load Time per Truck: 1.645 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br /> Truck Load Time: 1.645 Minutes Adjusted for site altitude: 1.645 Minutes <br /> Truck Maneuver and 1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br /> Dump Time: <br /> Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, <br /> watered, maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade Roll. Total Velocity Travel <br /> (Ft) N Res (%) Res (%) (fpm) Time <br /> min <br /> 1 500.00 0.00 3.00 3.00 2754 0.632 <br /> Haul Time: 0.632 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade Roll. Total Velocity Travel <br /> (Ft) N Res (%) Res (%) (fpm) Time <br /> min <br /> 1 500.00 0.00 3.00 3.00 4074 0.466 <br /> CIRCES Cost Estimating Software <br />