Laserfiche WebLink
Structures <br /> There following structures all lie within 200' of the permit boundary: <br /> Alamosa County Road 112S <br /> Xcel Energy Powerline <br /> Parker Ditch <br /> Fences owned by Goodwin and Melgoza <br /> General Mine Conditions <br /> The Existing Conditions Map shows the current conditions of the Alamosa Pit No. 2 (Swift Pit). <br /> The pit provided aggregate for local construction including gravel, road base, and landscape <br /> aggregate. Incidental materials not used for construction material will be used to reconstruct the <br /> pit floor and lessen the pit slopes. Mining disturbed 40 acres as shown on the Mining Map. <br /> Mine access is via County Road 112S. <br /> Previous Mining Information <br /> Toxic or acid-producing materials were not encountered during the mining operation. No blasting <br /> or explosives occurred during mining. Bulk storage of fuel and small amounts of lubricants may <br /> be stored on site and will be either double walled or housed within an earthen berm that will have a <br /> capacity of at least 110% of the volume of the tanks to be kept onsite. No permanent structures are <br /> onsite. Water for this operation will be used from the onsite ponds. Portable plants will be used <br /> onsite for washing sand while reclamation activities continue. <br /> Aggregate processing equipment is portable. The processing equipment may move throughout the <br /> site. Portable reclamation equipment such as loaders, dozers, trucks, and excavators will be serviced <br /> onsite as needed. Upon reclamation, all portable equipment will be removed from the site. On-site <br /> roads are temporary and will change as reclamation progresses. Support equipment will come to the <br /> site on an as-needed basis. <br />