Laserfiche WebLink
Contents Page <br /> A. Purpose 2 <br /> B. Facility Administrator 2 <br /> C. Facility Description 3 <br /> D. Potential Pollutant Sources/Material Inventory 3 <br /> E. Control Measures 3 <br /> F Final Site Stabilization 4 <br /> G. Additional Containment and Emergency Response Controls and Procedures 5 <br /> H. Inspections and Inspection Documentation 5 <br /> FIGURES <br /> 1 General Site location Plan <br /> 2 Site Plan Topo and Property Detail Plan <br /> 3 General Offsite Surface Water Flow Pattern and Existing Drainage Features <br /> 4 Location and Extents of Proposed Surface Water Control Measures <br /> 5 Proposed Temporary Sediment Collection Basin Plan <br /> PRE-CONSTRUCTION SITE PHOTOGRAPHS (locations provided on Figure 3) <br /> APPENDIX A: Field Inspection Review(FIR) Form, Records and Photos <br /> Sedgwick County/2023 Borrow Area Construction/Sedgwick County Construction Borrow Area Stormwater A E C <br />