My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:35:07 AM
Creation date
7/1/2025 9:32:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
Rule 4 Performance Standards
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-24 Revision Date: 4/9/25 <br /> Revision No.: MR-261 <br />4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS <br /> <br />4.07.1 General Requirement <br /> <br />Each exploration hole, or other bore hole well or other exposed underground opening encountered <br />during surface mining, will be cased, sealed,. plugged, or otherwise managed to meet the <br />requirements of this Section and described more fully in Section 2.05.4. <br /> <br />Holes used for surface blasting will not be included under the requirements of this Section. <br /> <br />4.07.2 Temporary Sealing <br /> <br />Each exploration hole or other drill or bore hole described in this Section will be protected, <br />inspected and maintained according to this Section. This performance is described more fully in <br />Section 2.02 and 2.05.4 of this application. <br /> <br />4.07.3 Permanent Sealing <br /> <br />Drilled holes no longer needed for monitoring or other approved uses will be backfilled and sealed <br />as described in this Section. This performance is described more fully in Sections 2.02 and 2.05.4 <br />of this application. <br /> <br />4.07.4 Abandonment in Designated Groundwater Basins <br /> <br />This subsection is not applicable to the Colowyo mining plan. <br /> <br />Exploration taking place inside and outside of the permit area will be handled through the Notice <br />of Intent (NOI) procedures. See the appropriate NOI for details for each program. <br /> <br />4.08 USE OF EXPLOSIVES <br /> <br />4.08.1 General Requirements <br /> <br />Colowyo will comply with all applicable State and Federal laws in the use of explosives. <br /> <br />Colowyo will conduct all blasts that use more than five pounds of explosives or blasting agent <br />according to the schedule required by Section 4.08.3. <br /> <br />All surface blasting operations at the Colowyo operation will be conducted by experienced, <br />certified, trained and competent persons who understand the hazards involved. Persons responsible <br />for blasting operations at a blasting site shall be familiar with the blasting plan and any site-specific <br />performance standards. The blaster and at least one other person must be present at the firing of a <br />blast. Each person responsible for blasting operations will possess a valid certification in <br />accordance with the appropriate federal and state law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.